Some Updates

Its been some long days for me and havent had much time to snap photos in the day, so here are some updates with horrible night shots as most of my pics are.

A couple of things moving along still:

- Bathroom is taking shape
- More plumbing (Water and Gas)
- Electrical continues to move forward slowly

Looks like we are shooting to get rough inspections done so we can close up the walls. We're not sure if this is possible until our Windows are installed. IF thats the case, we will be set back a few weeks because everything will come to a halt until the new windows arrive and are installed. That will suck if thats the case because we will not be making any forward progress (maybe with my networking stuff, but not towards making the home more complete.

We'll see how it goes.

As far as other things coming along, the MultiMedia part of the project starts this week and we have our furnace replacement and new ducting scheduled to be installed at the end of the month. Lighting has been ordered and the cans for those will begin to get installed as soon as they arrive.

Shower Valves and such installed. No special rainfall type shower head, though we could have....not really a fan of those things, but they look cool. So for the most part, a standard setup with nice hardware when we are done. I requested for a shower head on a hook so it can be held. We do have a normal one too. Im excited for this room when its done!

Bath Tub location has been framed - nice!

All piping is done for the Water Heater - On Demand - Gas and Water lines are done and ready for Pressure Testing I think.

I believe this is temporary and will be used for pressure testing all the new pipes. Have to make sure we have no leaks!

Ill be at the pad this weekend cleaning up some stuff. Contractors tend to clean after themselves, but Im pretty darn picky. When I walk in I want it CLEAN - even under construction.